Customization: | Available |
---|---|
Appearance: | Liquid |
Main Raw Material: | Acrylic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
DPTY 2K Solid Colors | ||||
Operation Parameter | ||||
Mixing Ratio | Ambient Temperature | Basecoat | Hardener | Thinner |
100 | 50 | 20-30 | ||
<15ºC | Solid Colour Paint | D960A | DF301,DF501 | |
15-30ºC | Solid Colour Paint | D970B | DF302,DF502 | |
>30ºC | Solid Colour Paint | D980C | DF303,DF503 | |
Pot Life at 25ºC | 4 hours | |||
Spraying Viscosity | 16~20 seconds(Tu-4 cup viscosity,25ºC) | |||
Spray Gun Set Up | Gravity feed: 1.2~1.5mm | |||
Suction feed: 1.2~1.7mm | ||||
The pressure of spray gun is 3~5 kg/cm2 | ||||
Spray-Painted Method | Two layers of single and double spray or three layers of single spray, spraying distance is 15~20cm, each layer's volatilization time is 10~15 minutes(25ºC) | |||
Film Thickness | 40~60 micrometer | |||
Drying Time | Time of dust-free:30 minutes/25ºC Hard drying time:24 hours/25ºC or 1 hour/60ºC |
|||
Range of Application | The surface of old paint or primer after sanding with the P1000# and P800# sand paper or removing the oil. | |||
Others | a.When spraying on the surface of thermoplastic paint,spray 2~3 layers with single wet spray,interval between layers is 5~10 minutes. | |||
b.Can add the softener, spray on plastic workpiece (Spray plastic primer first) | ||||
c.The paint film can be repaired or polished after fully dry time. |
DPTY 1K Basecoat Colors | |||
Operation Parameter | |||
Mixing Ratio | Ambient Temperature | Basecoat Colors | Thinner |
1 | 1-1.2 | ||
<15ºC | 1K metallic paint | DF301,DF501 | |
15-30ºC | 1K metallic paint | DF302,DF502 | |
>30ºC | 1K metallic paint | DF303,DF503 | |
Pot Life at 25ºC | 24 hours | ||
Spraying Viscosity | 14~18 seconds(Tu-4 cup viscosity,25ºC) | ||
Spray Gun Set Up | Gravity feed: 1.2~1.5mm | ||
Suction feed: 1.2~1.7mm | |||
The pressure of spray gun is 3~5 kg/cm2 | |||
Spray-Painted Method | Thin spray 2 ~3 layers with a air pressure of 3.5 kg, the volatilization time is 2 ~ 3 minutes(25ºC), spraying distance is 15~20cm. After covered completely, spray the last layer with 2 kg air pressure. After volatilize for 5 ~ 10 minutes but not more than 1 hour, spray varnish. | ||
Film Thickness | 10~20 micron | ||
Range of Application | The surface of old paint or primer after polishing with the P1000# sandpaper or removing the oil. | ||
Others | After spraying Dullis 1K metal paint,should spray varnish within 1 hour as much as possible,to ensure the accuracy and repeatability of color formula, stir equably before application. |
Q: Do you have formulas for mixing car paint?
A: Yes, we will supply formulas including CD and on-line formulas.
Q: Do we need to add binder into the paint?
A: We have highly concentrated and medium concentrated color paint, if you want the medium concentrated color paint, it's no need to add binders.
Q: Can you supply promotional materials to us?
A: Yes, we can supply tinter charts, color cards, poster, T-shirts, catalogs, tin openers, etc.
Q: What kinds of materials do you use for auto paint?
A: To ensure the quality of our auto paint, we usehigh quality raw materials, e.g.: titanium dioxide from DUPPONT, pigment from BASF, Ciba and Clariant, resin from Bayer, DEUCHEM and DSM, hardener from BASF and Bayer, etc.
Q: How about your delivery time?
A: 15 working days aft receiving your deposit.
Distributor Wanted!!!
Join us to help you make more benefits!
Contact us now!